Electric solution that empowers operators to predict, adapt, and act with confidence¡ªthroughout the life of the well
Find Tela workflows by discipline, technical task, and host application¡ªfrom data discovery and subsurface interpretation to drilling,
Modular data center infrastructure, prefabricated offsite and shipped ready to install¡ªcompressing deployment time by up to 40%
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from Ä¢¹½´«Ã½.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 05/02/2018
Challenge: Cement 7-in liner across weak formation after unsuccessful attempts to cure severe mud losses.
Solution:
Results:
An operator was drilling the 8 1/2-in section of a new well in Pakistan with mud weight of 1.07 g/cm3 [8.9 lbm/galUS] and encountered a weak formation. Attempts to cure losses with conventional LCMs (sawdust and cotton seed) were minimally effective, resulting in 1,130 m3 [7,100 bbl] of mud being lost in 10 days. Despite the losses, the hole was drilled to approximately 3,700 m [12,100 ft] and the 7-in liner run into the hole.
The liner limited the operator’s options to stop the losses because any significant circulation would increase the risk of destabilizing the open hole, which would jeopardize the cementing operation. Cementing without controlling the losses would likely result in losses of cement to the formation. Both of these cases would require expensive remedial cementing to achieve zonal isolation objectives.
The operator asked Ä¢¹½´«Ã½ for a competent solution to control the losses while cementing.
Based on prior experience in the field, the engineers were prepared for a Losseal Natural Fracture treatment with a composite blend of fibers and solids that create a strong impermeable grid, stopping mud or cement from flowing into naturally fractured zones. The engineers input well fluid information, loss rates, and other well data into the Lost Circulation Control Advisor software, an expert decision-tree application used to analyze and solve lost circulation problems, to generate a fit-for-purpose treatment design that would cure the losses with a single pill as part of the spacer train.
Well and pill data were also input into the CEMENTICS software, which was used to design thecomplete spacer train and cement slurry within the limited pore-to-fracture pressure window.
The cementing crew delivered the pumping operation as designed. When the Losseal Natural Fracture treatment reached the loss zone, the surface pressure and mud pit volume began to increase, indicating the pill had cured the losses and restored returns to surface. As a result, the operator recovered about USD 23,000 in WBM.
After the operation, a cement bond log confirmed the TOC and consistent cement bond across the interval, saving the operator USD 197,000 by eliminating the need for remedial cementing.
Advanced fiber-solid pill seals fractures, reduces mud loss, and boosts drilling efficiency.