Prevent lost circulation in fractures, vugular formations, matrix, and underground blowout events.
Application of FORM-A-SQUEEZE pill boosts drilling, controls losses in Mexico well
Challenge: Partial lost circulation at a rate of 11 m3/hr (69.2 bbl/hr) was observed.
Solution: Use of a FORM-A-SQUEEZE pill to seal the zone where the partial lost circulation occurred.
Results: Waiting times were eliminated and operations costs were reduced.
| Well Information |
|
| Location | Bay of Campeche, Mexico |
| Fluid type and density | VERSADRIL invert-emulsion, density of 1.30 SG (10.8 lb/gal) |
| Interval drilled | 12¼-in hole, interval of 3674 ft (1120 m): 2657–6660 ft (810–2030 m) |
| Temperature at loss depth | 198°F (92°C) |
The Situation
Drilling was being performed with a 12¼-in bit at 5853 ft (1784 m) with 1.30 SG (10.8 lb/gal) VERSADRIL invert-emulsion fluid and partial lost circulation at a rate of 11 m3/hr (69.2 bbl/hr) was observed. Pills containing 100 kg/m3 (35 lb/bbl) of lost circulation materials (LCM), M-I-X II Medium and CaCO3 M-70 and M-200 were pumped.
Drilling was continued with a partial loss of 5 to 11 m3/hr (31.4-69.2 bbl/hr) to a depth of 5,938 ft (1810 m) while pumping LCM pills, accumulating 110 m3 (692 bbl) of lost mud, resulting in suspension of the operation.
Client operating personnel met with Ä¢¹½´«Ã½ engineers in search of a technical alternative to properly seal the loss zone and to continue with normal operations.
The Solution
Ä¢¹½´«Ã½ recommended the use of a FORM-A-SQUEEZE pill to seal the zone where the partial lost circulation occurred. A 50-bbl, 1.31 SG (10.9 lb/gal) FORM-A-SQUEEZE pill consisting of diesel, FORM-A-SQUEEZE additive, and calcium carbonate was prepared and blended.
- Having the bit at 5905 ft (1800 m), 40 bbl of FORM-A-SQUEEZE pill was pumped. Pressure: 600 psi, displaced at 800 strokes per min
- Lifted bit to 5459 ft (1664 m), circulated at a low flow rate of 10 strokes for 5 min; then pumping was suspended, annular preventor was closed, satisfactorily repressurizing with 200 psi for 10 min
- Pressure was discharged to zero; annular preventor was opened and initially circulated at a low flow rate. The flow rate was gradually increased until initial drilling conditions were attained: 120 strokes, 540 gal/min, 2200 psi. No mud losses to the formation were observed
- The 12¼-in section was taken to bottom, circulated at a low flow rate, increasing little by little until reaching and maintaining 540 gal/min, and continued drilling with normal circulation
| Time (min) (ft) | Pressure (psi) | Bbl |
| 2.5 | 50 K | 1.6 |
| 5 | 100 | 3.2 |
| 7.5 | 150 | 4.8 |
| 10 | 200 | 6.4 |
| 15 | 150-200 | 7 |
| Time (min) | Pressure (psi) | Bbl | Remarks |
| 10 | 150-200 | 7 | Pressure was kept constant |
The Results
After pumping the FORM-A-SQUEEZE pill:
- A complete cycle was circulated at 540 gal/min, keeping normal levels
- Drilled to bottom without experiencing lost circulation, keeping normal levels at surface
- No waiting-on-cement times were required
- Continued drilling at the scheduled depth with normal circulation
- Waiting times were eliminated
- Operational costs were reduced
- Continued drilling the stage below scheduled times